This training uses animated demonstrations to walk through how to perform a Baseline Project Schedule Review in Oracle Primavera P6. It introduces new checklists for our Construction Contractors and a separate one for the Government in performing a review of the baseline network analysis schedule. The scheduling specification, Unified Facilities Guide Specifications (or UFGS) 01 31 17.00 20, was updated in August 2019 and now includes requirements for the Contractor’s designated Construction Scheduler to utilize this checklist and then sign it to verify their construction schedule is in compliance with the specification.
NAVFAC Baseline Project Schedule Review for Construction Managers
Duration: 59 Minutes
Training Subjects:
Construction
Format:
Web-based Training
Locations:
TWMS